EFFECT OF REGULATORY COMPLIANCE ON TIME AND COST PERFORMANCE OF RESIDENTIAL HOUSING PROJECTS IN THE NAIROBI METROPOLITAN COUNTIES, KENYA

Gudah John

Click an author's name to view their details

Gudah John Corresponding Author

Jomo Kenyatta University of Agriculture and Technology, Kenya

Correspondence: gudahjohn@gmail.com

Received
18 Aug 2026
Published
10 Sep 2026

Abstract

The residential housing sector contributes significantly to Kenya’s socio-economic development. However, residential housing projects in the Nairobi Metropolitan Counties continue to experience time overruns and cost escalations due to regulatory challenges. This study examined the effect of regulatory compliance, focusing on NEMA EIA timelines, county plan approval timelines, NCA compliance requirements and statutory fees, and policy coordination, on project performance. The study was guided by Institutional Theory, Stakeholder Theory, and Regulatory Compliance Theory. A positivist philosophy and descriptive cross-sectional survey design were adopted. The study targeted residential housing project stakeholders in Nairobi, Kiambu, Machakos, and Kajiado counties, with a sample of 240 respondents determined using Yamane’s formula. Data were collected using five-point Likert scale questionnaires and secondary sources, then analyzed using descriptive statistics, Pearson correlation, and multiple linear regression analysis to determine the effect of regulatory compliance on time and cost performance. The findings established that regulatory compliance significantly influences the time and cost performance of residential housing projects. Descriptive results showed that respondents agreed that NEMA EIA approval timelines, county plan approval timelines, NCA compliance requirements and statutory fees, and policy coordination affect project implementation outcomes. Correlation analysis revealed significant relationships between regulatory compliance dimensions and project performance, with prolonged approval timelines and compliance costs negatively associated with project performance, while policy coordination demonstrated a positive relationship. Regression results indicated that regulatory compliance dimensions jointly explained 71.0% of the variation in project performance (R² = 0.710). County plan approval timelines had the strongest negative influence on project performance (β = -0.312, p < 0.001), followed by NEMA EIA approval timelines (β = -0.238, p = 0.001) and NCA compliance requirements and statutory fees (β = -0.176, p = 0.012). Conversely, policy coordination had the strongest positive influence on project performance (β = 0.421, p < 0.001). The study concludes that regulatory compliance is a significant determinant of residential housing project performance, with regulatory inefficiencies contributing to project delays and cost escalation, while effective institutional coordination improves project delivery outcomes. The study recommends streamlining regulatory approval processes through digital platforms, strengthening coordination among regulatory agencies, reviewing compliance procedures and statutory fee structures, and adopting integrated regulatory management frameworks to enhance efficiency. The findings provide important insights for policymakers, regulatory institutions, developers, and construction professionals seeking to improve the timely and cost-effective delivery of residential housing projects in Kenya.

Keywords: NEMA Environmental Impact Assessment, County Plan Approval, NCA Compliance, Policy Coordination, Time Overrun, Cost Overrun, Residential Housing Projects.

How to Cite

APA

John, G. (2026). EFFECT OF REGULATORY COMPLIANCE ON TIME AND COST PERFORMANCE OF RESIDENTIAL HOUSING PROJECTS IN THE NAIROBI METROPOLITAN COUNTIES, KENYA. British Journal of Advanced Research, 1(3). https://doi.org/10.68263/BJAR-GMJJQMGG

MLA

John, Gudah. "EFFECT OF REGULATORY COMPLIANCE ON TIME AND COST PERFORMANCE OF RESIDENTIAL HOUSING PROJECTS IN THE NAIROBI METROPOLITAN COUNTIES, KENYA." British Journal of Advanced Research, vol. 1, no. 3, 2026. DOI: https://doi.org/10.68263/BJAR-GMJJQMGG

Chicago

John, Gudah. "EFFECT OF REGULATORY COMPLIANCE ON TIME AND COST PERFORMANCE OF RESIDENTIAL HOUSING PROJECTS IN THE NAIROBI METROPOLITAN COUNTIES, KENYA." British Journal of Advanced Research 1, no. 3 (2026). https://doi.org/10.68263/BJAR-GMJJQMGG

References

Aghimien, D. O., Aigbavboa, C. O., & Thwala, W. D. (2018). Microscoping the challenges of construction project delivery in South Africa. International Journal of Construction Management, 18(6), 499–510. https://doi.org/10.1080/15623599.2017.1360908 Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5 Alaghbari, W., Kadir, M. R. A., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206. https://doi.org/10.1108/09699980710731308 Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). Analysing delay causes and effects in Ghanaian state housing construction projects. International Journal of Managing Projects in Business, 8(1), 198–214. https://doi.org/10.1108/IJMPB-04-2014-0035 Architectural Association of Kenya. (2023). Construction industry report and regulatory challenges affecting development processes in Kenya. Architectural Association of Kenya. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010 Bourne, L. (2016). Stakeholder relationship management: A maturity model for organisational implementation. Routledge. Chan, D. W. M., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7 Chan, D. W. M., & Kumaraswamy, M. M. (2002). Compressing construction durations: Lessons learned from Hong Kong building projects. International Journal of Project Management, 20(1), 23–35. https://doi.org/10.1016/S0263-7863(00)00064-1 DiMaggio, P. J., & Powell, W. W. (1983). The iron cage revisited: Institutional isomorphism and collective rationality in organizational fields. American Sociological Review, 48(2), 147–160. https://doi.org/10.2307/2095101 Doloi, H. (2012). Understanding impacts of time and cost related construction delays. International Journal of Project Management, 30(4), 412–423. https://doi.org/10.1016/j.ijproman.2011.09.004 Donaldson, T., & Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence, and implications. Academy of Management Review, 20(1), 65–91. https://doi.org/10.5465/amr.1995.9503271992 Elawi, G. S. A., Algahtany, M., Kashiwagi, D., & Sullivan, K. (2016). Major factors causing construction delays in the UAE construction industry. Journal for the Advancement of Performance Information and Value, 8(1), 53–69. Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126–151. https://doi.org/10.1108/13664380910977592 Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409 Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman. Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in developing countries: Ghana case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8 Gunduz, M., Nielsen, Y., & Ozdemir, M. (2013). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133–139. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000125 Gunningham, N., Grabosky, P., & Sinclair, D. (1998). Smart regulation: Designing environmental policy. Oxford University Press. Gwaya, A. O., Masu, S. M., & Wanyona, G. (2014). A critical analysis of the factors affecting construction project performance in Kenya. International Journal of Soft Computing and Engineering, 4(1), 20–25. Hwang, B. G., & Leong, L. P. (2013). Comparison of schedule delay and causal factors between traditional and green construction projects. Technological and Economic Development of Economy, 19(2), 310–330. https://doi.org/10.3846/20294913.2013.798597 Joslin, R., & Müller, R. (2016). The relationship between project governance and project success. International Journal of Project Management, 34(4), 613–626. https://doi.org/10.1016/j.ijproman.2016.01.008 K’Akumu, O. A. (2011). Construction project management in Kenya: Challenges and opportunities. Journal of Construction in Developing Countries, 16(1), 1–14. Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522–531. https://doi.org/10.1016/j.ijproman.2008.07.003 Kenya Institute of Building Technology. (2020). Construction cost assessment and statutory compliance requirements in Kenya. Kenya Institute of Building Technology. Khang, D. B., & Moe, T. L. (2008). Success criteria and factors for international development projects. International Journal of Project Management, 26(2), 199–209. https://doi.org/10.1016/j.ijproman.2007.08.005 Kikwasi, G. J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, 12(1), 52–59. Love, P. E. D., Edwards, D. J., & Irani, Z. (2012). Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns. IEEE Transactions on Engineering Management, 59(4), 560–571. https://doi.org/10.1109/TEM.2011.2163628 Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90046-9 Meyer, J. W., & Rowan, B. (1977). Institutionalized organizations: Formal structure as myth and ceremony. American Journal of Sociology, 83(2), 340–363. https://doi.org/10.1086/226550 Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience. Academy of Management Review, 22(4), 853–886. https://doi.org/10.5465/amr.1997.9711022105 Mok, K. Y., Shen, G. Q., & Yang, R. J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007 Morris, P. W. G. (2013). Reconstructing project management. Wiley-Blackwell. Musa, M., Oyedele, L. O., & Alaka, H. (2015). Construction information management challenges in Nigeria. Journal of Information Technology in Construction, 20, 255–271. National Construction Authority. (2023). Construction industry performance and regulatory compliance report. Nairobi: National Construction Authority. Ochieng, E. G., & Price, A. D. F. (2010). Managing cross-cultural communication in multicultural construction project teams. Engineering, Construction and Architectural Management, 17(5), 449–467. https://doi.org/10.1108/09699981011074542 Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5 OECD. (2021). Regulatory policy outlook 2021. OECD Publishing. https://doi.org/10.1787/38b0fdb1-en Office of the Auditor-General. (2023). Report of the Auditor-General on national and county government projects. Nairobi: Office of the Auditor-General Kenya. Ofori, G. (2012). Developing the construction industry in Ghana: The case for a central agency. Journal of Construction in Developing Countries, 17(1), 1–20. Olander, S., & Landin, A. (2008). A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), 553–561. https://doi.org/10.1080/01446190802024845 Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007 Sweis, G., Sweis, R., Abu Hammad, A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665–674. https://doi.org/10.1016/j.ijproman.2007.09.009 Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual framework. International Journal of Project Management, 32(8), 1382–1394. https://doi.org/10.1016/j.ijproman.2013.07.006 UN-Habitat. (2021). The role of housing in sustainable urban development. United Nations Human Settlements Programme. Wachira, J., & Ngugi, P. (2021). Regulatory frameworks and completion of housing projects in Nairobi County, Kenya. Windapo, A. O., & Cattell, K. (2013). The South African construction industry: Perceptions of key challenges facing the industry. Journal of Construction in Developing Countries, 18(2), 65–79. World Bank. (2020). Doing Business 2020: Comparing business regulation in 190 economies. World Bank. Yang, J., Shen, G. Q., Ho, M., Drew, D., & Chan, A. (2009). Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management, 15(4), 337–348. https://doi.org/10.3846/1392-3730.2009.15.337-348 Zaneldin, E. K. (2006). Construction claims in United Arab Emirates: Types, causes, and frequency. International Journal of Project Management, 24(5), 453–459. https://doi.org/10.1016/j.ijproman.2006.02.006
CC BY-NC-SA 4.0

This article is published under the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License. Free to read, share, and adapt with attribution.

Article Access
↓ Download PDF
44
Views
28
Downloads
Metadata
ISSN 3153-709X
Tracking ID BJAR_AUG_26_027
Article No. 006
↓ Download JATS XML
Article Info
Journal BJAR
Volume Vol 1, No 3
Year 2026
Type Original Research Article
Licence CC BY-NC-SA 4.0
Share