References
Aghimien, D. O., Aigbavboa, C. O., & Thwala, W. D. (2018). Microscoping the challenges of construction project delivery in South Africa. International Journal of Construction Management, 18(6), 499–510. https://doi.org/10.1080/15623599.2017.1360908
Aibinu, A. A., & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5
Alaghbari, W., Kadir, M. R. A., Salim, A., & Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206. https://doi.org/10.1108/09699980710731308
Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). Analysing delay causes and effects in Ghanaian state housing construction projects. International Journal of Managing Projects in Business, 8(1), 198–214. https://doi.org/10.1108/IJMPB-04-2014-0035
Architectural Association of Kenya. (2023). Construction industry report and regulatory challenges affecting development processes in Kenya. Architectural Association of Kenya.
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010
Bourne, L. (2016). Stakeholder relationship management: A maturity model for organisational implementation. Routledge.
Chan, D. W. M., & Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7
Chan, D. W. M., & Kumaraswamy, M. M. (2002). Compressing construction durations: Lessons learned from Hong Kong building projects. International Journal of Project Management, 20(1), 23–35. https://doi.org/10.1016/S0263-7863(00)00064-1
DiMaggio, P. J., & Powell, W. W. (1983). The iron cage revisited: Institutional isomorphism and collective rationality in organizational fields. American Sociological Review, 48(2), 147–160. https://doi.org/10.2307/2095101
Doloi, H. (2012). Understanding impacts of time and cost related construction delays. International Journal of Project Management, 30(4), 412–423. https://doi.org/10.1016/j.ijproman.2011.09.004
Donaldson, T., & Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence, and implications. Academy of Management Review, 20(1), 65–91. https://doi.org/10.5465/amr.1995.9503271992
Elawi, G. S. A., Algahtany, M., Kashiwagi, D., & Sullivan, K. (2016). Major factors causing construction delays in the UAE construction industry. Journal for the Advancement of Performance Information and Value, 8(1), 53–69.
Enshassi, A., Al-Najjar, J., & Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126–151. https://doi.org/10.1108/13664380910977592
Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409
Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman.
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in developing countries: Ghana case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8
Gunduz, M., Nielsen, Y., & Ozdemir, M. (2013). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133–139. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000125
Gunningham, N., Grabosky, P., & Sinclair, D. (1998). Smart regulation: Designing environmental policy. Oxford University Press.
Gwaya, A. O., Masu, S. M., & Wanyona, G. (2014). A critical analysis of the factors affecting construction project performance in Kenya. International Journal of Soft Computing and Engineering, 4(1), 20–25.
Hwang, B. G., & Leong, L. P. (2013). Comparison of schedule delay and causal factors between traditional and green construction projects. Technological and Economic Development of Economy, 19(2), 310–330. https://doi.org/10.3846/20294913.2013.798597
Joslin, R., & Müller, R. (2016). The relationship between project governance and project success. International Journal of Project Management, 34(4), 613–626. https://doi.org/10.1016/j.ijproman.2016.01.008
K’Akumu, O. A. (2011). Construction project management in Kenya: Challenges and opportunities. Journal of Construction in Developing Countries, 16(1), 1–14.
Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522–531. https://doi.org/10.1016/j.ijproman.2008.07.003
Kenya Institute of Building Technology. (2020). Construction cost assessment and statutory compliance requirements in Kenya. Kenya Institute of Building Technology.
Khang, D. B., & Moe, T. L. (2008). Success criteria and factors for international development projects. International Journal of Project Management, 26(2), 199–209. https://doi.org/10.1016/j.ijproman.2007.08.005
Kikwasi, G. J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, 12(1), 52–59.
Love, P. E. D., Edwards, D. J., & Irani, Z. (2012). Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns. IEEE Transactions on Engineering Management, 59(4), 560–571. https://doi.org/10.1109/TEM.2011.2163628
Mansfield, N. R., Ugwu, O. O., & Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90046-9
Meyer, J. W., & Rowan, B. (1977). Institutionalized organizations: Formal structure as myth and ceremony. American Journal of Sociology, 83(2), 340–363. https://doi.org/10.1086/226550
Mitchell, R. K., Agle, B. R., & Wood, D. J. (1997). Toward a theory of stakeholder identification and salience. Academy of Management Review, 22(4), 853–886. https://doi.org/10.5465/amr.1997.9711022105
Mok, K. Y., Shen, G. Q., & Yang, R. J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007
Morris, P. W. G. (2013). Reconstructing project management. Wiley-Blackwell.
Musa, M., Oyedele, L. O., & Alaka, H. (2015). Construction information management challenges in Nigeria. Journal of Information Technology in Construction, 20, 255–271.
National Construction Authority. (2023). Construction industry performance and regulatory compliance report. Nairobi: National Construction Authority.
Ochieng, E. G., & Price, A. D. F. (2010). Managing cross-cultural communication in multicultural construction project teams. Engineering, Construction and Architectural Management, 17(5), 449–467. https://doi.org/10.1108/09699981011074542
Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5
OECD. (2021). Regulatory policy outlook 2021. OECD Publishing. https://doi.org/10.1787/38b0fdb1-en
Office of the Auditor-General. (2023). Report of the Auditor-General on national and county government projects. Nairobi: Office of the Auditor-General Kenya.
Ofori, G. (2012). Developing the construction industry in Ghana: The case for a central agency. Journal of Construction in Developing Countries, 17(1), 1–20.
Olander, S., & Landin, A. (2008). A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), 553–561. https://doi.org/10.1080/01446190802024845
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
Sweis, G., Sweis, R., Abu Hammad, A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665–674. https://doi.org/10.1016/j.ijproman.2007.09.009
Too, E. G., & Weaver, P. (2014). The management of project management: A conceptual framework. International Journal of Project Management, 32(8), 1382–1394. https://doi.org/10.1016/j.ijproman.2013.07.006
UN-Habitat. (2021). The role of housing in sustainable urban development. United Nations Human Settlements Programme.
Wachira, J., & Ngugi, P. (2021). Regulatory frameworks and completion of housing projects in Nairobi County, Kenya.
Windapo, A. O., & Cattell, K. (2013). The South African construction industry: Perceptions of key challenges facing the industry. Journal of Construction in Developing Countries, 18(2), 65–79.
World Bank. (2020). Doing Business 2020: Comparing business regulation in 190 economies. World Bank.
Yang, J., Shen, G. Q., Ho, M., Drew, D., & Chan, A. (2009). Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management, 15(4), 337–348. https://doi.org/10.3846/1392-3730.2009.15.337-348
Zaneldin, E. K. (2006). Construction claims in United Arab Emirates: Types, causes, and frequency. International Journal of Project Management, 24(5), 453–459. https://doi.org/10.1016/j.ijproman.2006.02.006