<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.2 20190208//EN"
  "https://jats.nlm.nih.gov/publishing/1.2/JATS-journalpublishing1.dtd">
<article xmlns:xlink="http://www.w3.org/1999/xlink"
         article-type="original-research-article">

  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">BJAR</journal-id>
      <journal-title-group>
        <journal-title>British Journal of Advanced Research</journal-title>
        <abbrev-journal-title>BJAR</abbrev-journal-title>
      </journal-title-group>
            <issn pub-type="epub">3153-709X</issn>
            <publisher>
        <publisher-name>Ivory and Finch Publishers</publisher-name>
      </publisher>
    </journal-meta>

    <article-meta>
      <article-id pub-id-type="doi">10.68263/BJAR-GMJJQMGG</article-id>
      <article-id pub-id-type="publisher-id">BJAR_AUG_26_027</article-id>

      <article-categories>
        <subj-group subj-group-type="heading">
          <subject>Original Research Article</subject>
        </subj-group>
      </article-categories>

      <title-group>
        <article-title>EFFECT OF REGULATORY COMPLIANCE ON TIME AND COST PERFORMANCE OF RESIDENTIAL HOUSING PROJECTS IN THE NAIROBI METROPOLITAN COUNTIES, KENYA</article-title>
      </title-group>

      <contrib-group>
        <contrib contrib-type="author">
          <name>
                        <surname>John</surname>
            <given-names>Gudah</given-names>
          </name>
                    <aff>Jomo Kenyatta University of Agriculture and Technology, Kenya</aff>
          <email>gudahjohn@gmail.com</email>
        </contrib>
              </contrib-group>

            <pub-date pub-type="epub">
        <day>10</day>
        <month>09</month>
        <year>2026</year>
      </pub-date>
      <volume>1</volume>
      <issue>3</issue>
      
      
            <self-uri xlink:href="https://doi.org/10.68263/BJAR-GMJJQMGG"/>
      
      <abstract>
        <p>The residential housing sector contributes significantly to Kenya’s socio-economic development. However, residential housing projects in the Nairobi Metropolitan Counties continue to experience time overruns and cost escalations due to regulatory challenges. This study examined the effect of regulatory compliance, focusing on NEMA EIA timelines, county plan approval timelines, NCA compliance requirements and statutory fees, and policy coordination, on project performance. The study was guided by Institutional Theory, Stakeholder Theory, and Regulatory Compliance Theory. A positivist philosophy and descriptive cross-sectional survey design were adopted. The study targeted residential housing project stakeholders in Nairobi, Kiambu, Machakos, and Kajiado counties, with a sample of 240 respondents determined using Yamane’s formula. Data were collected using five-point Likert scale questionnaires and secondary sources, then analyzed using descriptive statistics, Pearson correlation, and multiple linear regression analysis to determine the effect of regulatory compliance on time and cost performance. The findings established that regulatory compliance significantly influences the time and cost performance of residential housing projects. Descriptive results showed that respondents agreed that NEMA EIA approval timelines, county plan approval timelines, NCA compliance requirements and statutory fees, and policy coordination affect project implementation outcomes. Correlation analysis revealed significant relationships between regulatory compliance dimensions and project performance, with prolonged approval timelines and compliance costs negatively associated with project performance, while policy coordination demonstrated a positive relationship. Regression results indicated that regulatory compliance dimensions jointly explained 71.0% of the variation in project performance (R² = 0.710). County plan approval timelines had the strongest negative influence on project performance (β = -0.312, p &lt; 0.001), followed by NEMA EIA approval timelines (β = -0.238, p = 0.001) and NCA compliance requirements and statutory fees (β = -0.176, p = 0.012). Conversely, policy coordination had the strongest positive influence on project performance (β = 0.421, p &lt; 0.001). The study concludes that regulatory compliance is a significant determinant of residential housing project performance, with regulatory inefficiencies contributing to project delays and cost escalation, while effective institutional coordination improves project delivery outcomes. The study recommends streamlining regulatory approval processes through digital platforms, strengthening coordination among regulatory agencies, reviewing compliance procedures and statutory fee structures, and adopting integrated regulatory management frameworks to enhance efficiency. The findings provide important insights for policymakers, regulatory institutions, developers, and construction professionals seeking to improve the timely and cost-effective delivery of residential housing projects in Kenya.</p>
      </abstract>

            <kwd-group kwd-group-type="author-keywords">
                <kwd>NEMA Environmental Impact Assessment</kwd>
                <kwd>County Plan Approval</kwd>
                <kwd>NCA Compliance</kwd>
                <kwd>Policy Coordination</kwd>
                <kwd>Time Overrun</kwd>
                <kwd>Cost Overrun</kwd>
                <kwd>Residential Housing Projects.</kwd>
              </kwd-group>
      
      <history>
        <date date-type="received">
          <day>18</day>
          <month>08</month>
          <year>2026</year>
        </date>
                <date date-type="accepted">
          <day>20</day>
          <month>08</month>
          <year>2026</year>
        </date>
              </history>

      <permissions>
        <copyright-statement>Copyright &copy; 2026 by the authors</copyright-statement>
        <license license-type="open-access">
          <license-p>This article is distributed under the terms of the Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.</license-p>
        </license>
      </permissions>

    </article-meta>
  </front>

    <back>
    <ref-list>
      <title>References</title>
                      <ref id="ref-1">
          <mixed-citation>Aghimien, D. O., Aigbavboa, C. O., &amp;amp; Thwala, W. D. (2018). Microscoping the challenges of construction project delivery in South Africa. International Journal of Construction Management, 18(6), 499–510. https://doi.org/10.1080/15623599.2017.1360908</mixed-citation>
        </ref>
                              <ref id="ref-2">
          <mixed-citation>Aibinu, A. A., &amp;amp; Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599. https://doi.org/10.1016/S0263-7863(02)00028-5</mixed-citation>
        </ref>
                              <ref id="ref-3">
          <mixed-citation>Alaghbari, W., Kadir, M. R. A., Salim, A., &amp;amp; Ernawati. (2007). The significant factors causing delay of building construction projects in Malaysia. Engineering, Construction and Architectural Management, 14(2), 192–206. https://doi.org/10.1108/09699980710731308</mixed-citation>
        </ref>
                              <ref id="ref-4">
          <mixed-citation>Amoatey, C. T., Ameyaw, Y. A., Adaku, E., &amp;amp; Famiyeh, S. (2015). Analysing delay causes and effects in Ghanaian state housing construction projects. International Journal of Managing Projects in Business, 8(1), 198–214. https://doi.org/10.1108/IJMPB-04-2014-0035</mixed-citation>
        </ref>
                              <ref id="ref-5">
          <mixed-citation>Architectural Association of Kenya. (2023). Construction industry report and regulatory challenges affecting development processes in Kenya. Architectural Association of Kenya.</mixed-citation>
        </ref>
                              <ref id="ref-6">
          <mixed-citation>Assaf, S. A., &amp;amp; Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357. https://doi.org/10.1016/j.ijproman.2005.11.010</mixed-citation>
        </ref>
                              <ref id="ref-7">
          <mixed-citation>Bourne, L. (2016). Stakeholder relationship management: A maturity model for organisational implementation. Routledge.</mixed-citation>
        </ref>
                              <ref id="ref-8">
          <mixed-citation>Chan, D. W. M., &amp;amp; Kumaraswamy, M. M. (1997). A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, 15(1), 55–63. https://doi.org/10.1016/S0263-7863(96)00039-7</mixed-citation>
        </ref>
                              <ref id="ref-9">
          <mixed-citation>Chan, D. W. M., &amp;amp; Kumaraswamy, M. M. (2002). Compressing construction durations: Lessons learned from Hong Kong building projects. International Journal of Project Management, 20(1), 23–35. https://doi.org/10.1016/S0263-7863(00)00064-1</mixed-citation>
        </ref>
                              <ref id="ref-10">
          <mixed-citation>DiMaggio, P. J., &amp;amp; Powell, W. W. (1983). The iron cage revisited: Institutional isomorphism and collective rationality in organizational fields. American Sociological Review, 48(2), 147–160. https://doi.org/10.2307/2095101</mixed-citation>
        </ref>
                              <ref id="ref-11">
          <mixed-citation>Doloi, H. (2012). Understanding impacts of time and cost related construction delays. International Journal of Project Management, 30(4), 412–423. https://doi.org/10.1016/j.ijproman.2011.09.004</mixed-citation>
        </ref>
                              <ref id="ref-12">
          <mixed-citation>Donaldson, T., &amp;amp; Preston, L. E. (1995). The stakeholder theory of the corporation: Concepts, evidence, and implications. Academy of Management Review, 20(1), 65–91. https://doi.org/10.5465/amr.1995.9503271992</mixed-citation>
        </ref>
                              <ref id="ref-13">
          <mixed-citation>Elawi, G. S. A., Algahtany, M., Kashiwagi, D., &amp;amp; Sullivan, K. (2016). Major factors causing construction delays in the UAE construction industry. Journal for the Advancement of Performance Information and Value, 8(1), 53–69.</mixed-citation>
        </ref>
                              <ref id="ref-14">
          <mixed-citation>Enshassi, A., Al-Najjar, J., &amp;amp; Kumaraswamy, M. (2009). Delays and cost overruns in the construction projects in the Gaza Strip. Journal of Financial Management of Property and Construction, 14(2), 126–151. https://doi.org/10.1108/13664380910977592</mixed-citation>
        </ref>
                              <ref id="ref-15">
          <mixed-citation>Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6–19. https://doi.org/10.1002/pmj.21409</mixed-citation>
        </ref>
                              <ref id="ref-16">
          <mixed-citation>Freeman, R. E. (1984). Strategic management: A stakeholder approach. Pitman.</mixed-citation>
        </ref>
                              <ref id="ref-17">
          <mixed-citation>Frimpong, Y., Oluwoye, J., &amp;amp; Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in developing countries: Ghana case study. International Journal of Project Management, 21(5), 321–326. https://doi.org/10.1016/S0263-7863(02)00055-8</mixed-citation>
        </ref>
                              <ref id="ref-18">
          <mixed-citation>Gunduz, M., Nielsen, Y., &amp;amp; Ozdemir, M. (2013). Quantification of delay factors using the relative importance index method for construction projects in Turkey. Journal of Management in Engineering, 29(2), 133–139. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000125</mixed-citation>
        </ref>
                              <ref id="ref-19">
          <mixed-citation>Gunningham, N., Grabosky, P., &amp;amp; Sinclair, D. (1998). Smart regulation: Designing environmental policy. Oxford University Press.</mixed-citation>
        </ref>
                              <ref id="ref-20">
          <mixed-citation>Gwaya, A. O., Masu, S. M., &amp;amp; Wanyona, G. (2014). A critical analysis of the factors affecting construction project performance in Kenya. International Journal of Soft Computing and Engineering, 4(1), 20–25.</mixed-citation>
        </ref>
                              <ref id="ref-21">
          <mixed-citation>Hwang, B. G., &amp;amp; Leong, L. P. (2013). Comparison of schedule delay and causal factors between traditional and green construction projects. Technological and Economic Development of Economy, 19(2), 310–330. https://doi.org/10.3846/20294913.2013.798597</mixed-citation>
        </ref>
                              <ref id="ref-22">
          <mixed-citation>Joslin, R., &amp;amp; Müller, R. (2016). The relationship between project governance and project success. International Journal of Project Management, 34(4), 613–626. https://doi.org/10.1016/j.ijproman.2016.01.008</mixed-citation>
        </ref>
                              <ref id="ref-23">
          <mixed-citation>K’Akumu, O. A. (2011). Construction project management in Kenya: Challenges and opportunities. Journal of Construction in Developing Countries, 16(1), 1–14.</mixed-citation>
        </ref>
                              <ref id="ref-24">
          <mixed-citation>Kaliba, C., Muya, M., &amp;amp; Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27(5), 522–531. https://doi.org/10.1016/j.ijproman.2008.07.003</mixed-citation>
        </ref>
                              <ref id="ref-25">
          <mixed-citation>Kenya Institute of Building Technology. (2020). Construction cost assessment and statutory compliance requirements in Kenya. Kenya Institute of Building Technology.</mixed-citation>
        </ref>
                              <ref id="ref-26">
          <mixed-citation>Khang, D. B., &amp;amp; Moe, T. L. (2008). Success criteria and factors for international development projects. International Journal of Project Management, 26(2), 199–209. https://doi.org/10.1016/j.ijproman.2007.08.005</mixed-citation>
        </ref>
                              <ref id="ref-27">
          <mixed-citation>Kikwasi, G. J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, 12(1), 52–59.</mixed-citation>
        </ref>
                              <ref id="ref-28">
          <mixed-citation>Love, P. E. D., Edwards, D. J., &amp;amp; Irani, Z. (2012). Moving beyond optimism bias and strategic misrepresentation: An explanation for social infrastructure project cost overruns. IEEE Transactions on Engineering Management, 59(4), 560–571. https://doi.org/10.1109/TEM.2011.2163628</mixed-citation>
        </ref>
                              <ref id="ref-29">
          <mixed-citation>Mansfield, N. R., Ugwu, O. O., &amp;amp; Doran, T. (1994). Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, 12(4), 254–260. https://doi.org/10.1016/0263-7863(94)90046-9</mixed-citation>
        </ref>
                              <ref id="ref-30">
          <mixed-citation>Meyer, J. W., &amp;amp; Rowan, B. (1977). Institutionalized organizations: Formal structure as myth and ceremony. American Journal of Sociology, 83(2), 340–363. https://doi.org/10.1086/226550</mixed-citation>
        </ref>
                              <ref id="ref-31">
          <mixed-citation>Mitchell, R. K., Agle, B. R., &amp;amp; Wood, D. J. (1997). Toward a theory of stakeholder identification and salience. Academy of Management Review, 22(4), 853–886. https://doi.org/10.5465/amr.1997.9711022105</mixed-citation>
        </ref>
                              <ref id="ref-32">
          <mixed-citation>Mok, K. Y., Shen, G. Q., &amp;amp; Yang, R. J. (2015). Stakeholder management studies in mega construction projects: A review and future directions. International Journal of Project Management, 33(2), 446–457. https://doi.org/10.1016/j.ijproman.2014.08.007</mixed-citation>
        </ref>
                              <ref id="ref-33">
          <mixed-citation>Morris, P. W. G. (2013). Reconstructing project management. Wiley-Blackwell.</mixed-citation>
        </ref>
                              <ref id="ref-34">
          <mixed-citation>Musa, M., Oyedele, L. O., &amp;amp; Alaka, H. (2015). Construction information management challenges in Nigeria. Journal of Information Technology in Construction, 20, 255–271.</mixed-citation>
        </ref>
                              <ref id="ref-35">
          <mixed-citation>National Construction Authority. (2023). Construction industry performance and regulatory compliance report. Nairobi: National Construction Authority.</mixed-citation>
        </ref>
                              <ref id="ref-36">
          <mixed-citation>Ochieng, E. G., &amp;amp; Price, A. D. F. (2010). Managing cross-cultural communication in multicultural construction project teams. Engineering, Construction and Architectural Management, 17(5), 449–467. https://doi.org/10.1108/09699981011074542</mixed-citation>
        </ref>
                              <ref id="ref-37">
          <mixed-citation>Odeh, A. M., &amp;amp; Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20(1), 67–73. https://doi.org/10.1016/S0263-7863(00)00037-5</mixed-citation>
        </ref>
                              <ref id="ref-38">
          <mixed-citation>OECD. (2021). Regulatory policy outlook 2021. OECD Publishing. https://doi.org/10.1787/38b0fdb1-en</mixed-citation>
        </ref>
                              <ref id="ref-39">
          <mixed-citation>Office of the Auditor-General. (2023). Report of the Auditor-General on national and county government projects. Nairobi: Office of the Auditor-General Kenya.</mixed-citation>
        </ref>
                              <ref id="ref-40">
          <mixed-citation>Ofori, G. (2012). Developing the construction industry in Ghana: The case for a central agency. Journal of Construction in Developing Countries, 17(1), 1–20.</mixed-citation>
        </ref>
                              <ref id="ref-41">
          <mixed-citation>Olander, S., &amp;amp; Landin, A. (2008). A comparative study of factors affecting the external stakeholder management process. Construction Management and Economics, 26(6), 553–561. https://doi.org/10.1080/01446190802024845</mixed-citation>
        </ref>
                              <ref id="ref-42">
          <mixed-citation>Sambasivan, M., &amp;amp; Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007</mixed-citation>
        </ref>
                              <ref id="ref-43">
          <mixed-citation>Sweis, G., Sweis, R., Abu Hammad, A., &amp;amp; Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), 665–674. https://doi.org/10.1016/j.ijproman.2007.09.009</mixed-citation>
        </ref>
                              <ref id="ref-44">
          <mixed-citation>Too, E. G., &amp;amp; Weaver, P. (2014). The management of project management: A conceptual framework. International Journal of Project Management, 32(8), 1382–1394. https://doi.org/10.1016/j.ijproman.2013.07.006</mixed-citation>
        </ref>
                              <ref id="ref-45">
          <mixed-citation>UN-Habitat. (2021). The role of housing in sustainable urban development. United Nations Human Settlements Programme.</mixed-citation>
        </ref>
                              <ref id="ref-46">
          <mixed-citation>Wachira, J., &amp;amp; Ngugi, P. (2021). Regulatory frameworks and completion of housing projects in Nairobi County, Kenya.</mixed-citation>
        </ref>
                              <ref id="ref-47">
          <mixed-citation>Windapo, A. O., &amp;amp; Cattell, K. (2013). The South African construction industry: Perceptions of key challenges facing the industry. Journal of Construction in Developing Countries, 18(2), 65–79.</mixed-citation>
        </ref>
                              <ref id="ref-48">
          <mixed-citation>World Bank. (2020). Doing Business 2020: Comparing business regulation in 190 economies. World Bank.</mixed-citation>
        </ref>
                              <ref id="ref-49">
          <mixed-citation>Yang, J., Shen, G. Q., Ho, M., Drew, D., &amp;amp; Chan, A. (2009). Exploring critical success factors for stakeholder management in construction projects. Journal of Civil Engineering and Management, 15(4), 337–348. https://doi.org/10.3846/1392-3730.2009.15.337-348</mixed-citation>
        </ref>
                              <ref id="ref-50">
          <mixed-citation>Zaneldin, E. K. (2006). Construction claims in United Arab Emirates: Types, causes, and frequency. International Journal of Project Management, 24(5), 453–459. https://doi.org/10.1016/j.ijproman.2006.02.006</mixed-citation>
        </ref>
                  </ref-list>
  </back>
  
</article>
